BELLBIRD JUNCTION - BELLBIRD - PELTON
2008 - 4816 48s33 - Leaving Pelton loader - Brad Peadon

Passing under the bridge that once carried trains to Kalingo and other collieries, the loaded train is within the Bellbird Cutting. A second track from Bellbird Colliery(former site near rear of train) once also fit in here.

4816 48s33 depart Pelton loader with a loaded coal train. 2009

5-4-2009 - Pelton Unloader : Brad Peadon
-
-
-
-
-
-
-
-
--
-
-
-
-
-
5-4-2009 - PL5 48137 48134 PL2 up coal departs Pelton Colliery : Brad Peadon
No comments:
Post a Comment